The Bridge’s progress

I passed the site of our footbridge this afternoon just after four.  The workmen were there, so I asked about it.  No they can’t open it quite yet, but it should just be a couple of days.

As I was there, they opened up the bridge end of the section of path that had been closed.  They didn’t know why it had been closed, either, unless it was Health and Safety (a possibility, and a good scapegoat if not). If it was on some spurious safety grounds, they’ve scored a great big own goal there: the fallen leaves and moss that accumulated on the unused path are certainly more slippery than that path would normally be.

Posted on December 20, 2006, in local, tavistock. Bookmark the permalink. 1 Comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: